Proposal / Statement of Work
Pre-contract pitch. Send this before the contract — if they say yes, contract follows.
Not legal advice. This is a starting point. Review with a lawyer before signing anything that matters.
From
Prepared for
Investment
Total: $4,300
Proposal
[Project]
Prepared for ____________ by ____________ · October 6, 2026
Investment
| Item | Qty | Rate | Amount |
|---|---|---|---|
| Pre-production (scripting, planning) | 1 | $800 | $800 |
| Production day | 1 | $2,000 | $2,000 |
| Post-production (edit, color, mix) | 1 | $1,500 | $1,500 |
| Total investment | $4,300 | ||
Terms
50% deposit on acceptance. Balance due Net 14 after final delivery. Proposal valid 30 days.
Accepted · ____________
Date: __________
Generated free by Slate · getslate.net
Pair this with
All 31 tools →What a proposal / statement of work actually does
A proposal is what you send before a contract: what you would make, what it would cost, and why you are the right people to make it. Its job is to get a yes. The contract that follows makes that yes binding.
When you need one
- After a discovery conversation, when you understand the project well enough to scope it.
- Any time more than one supplier is being considered, which is more often than clients say.
- For work where the client needs something to show someone else — a budget holder, a committee.
What it should contain
- What you understood
- Their objective, in your words. This is what separates a proposal from a price list.
- What you would make
- Deliverables, specifically: how many films, what lengths, which formats.
- How it would run
- Pre-production, shoot days, post. Clients are reassured by a process.
- Line-item pricing
- Broken down enough to be understood, not so far that every line becomes a negotiation.
- A timeline
- From approval to delivery, with the client's own approval steps shown.
- What happens next
- One clear action. A proposal that ends without an instruction tends to end.
- A validity date
- Prices and availability hold until a date, which is honest and also creates a reason to decide.
What people get wrong
- Leading with your company
- Three paragraphs of history before any mention of their problem. Lead with what they are trying to achieve.
- One total and nothing else
- A single number invites haggling. A breakdown invites a conversation about scope.
- No expiry
- A proposal that is still live six months later costs you when your rates have moved.
- No clear next step
- "Let me know what you think" is not an instruction.
Common questions
What is the difference between a proposal and a contract?
A proposal persuades; a contract binds. The proposal sets out what you would do and what it costs, and if the client says yes, the contract turns that into enforceable terms. Many studios run them as one signed step.
How long should a video production proposal be?
Long enough to show you understood the brief and short enough to be read. Two to four pages is typical for commercial work. Length is not the thing clients remember; specificity is.
Let them accept and sign in one sitting
Set up your packages once, send a priced proposal, and when the client accepts, Slate writes the contract and puts the job on the calendar automatically.
